ResultsThe ButK project's aim is to produce public documents that can be consulted by all publics, including municipalities that want to make the switch to efficient street and office lighting systems through a tendering process. To view and download the documents produced by BUtK project consortium, please scroll down the page. Deliverable 5 Calculation and reporting of CO2 emission and savings attributable to lighting Annexes: Deliverable 6 Report on the analysis of legal framework to implement TPF (Third Party Financing) schemes Deliverable 7 National standard TPF scheme documents from the municipalities of: Deliverable 8 First draft of five feasibility studies for the municipalities of Dej, Raciechowice, Riga, Slovenska-Bistrica and Voru Deliverable 9 Final feasibility reports for the following municipalities:
Deliverable 10 Information on tender procedure. This document provides information on tasks, responsibilities and criteria for tender and awarding of Contracting services for public lighting Fact sheet concerning various efficient lighting alternatives for municipalities Partners did go to tenders without pre-qualification, in accordance with their national legislation.
Deliverable 11 Call for tenders for the modernisation of the public lighting system in the partner municipalities
Deliverable 12 Three partner municipalities, Raciechowice (Poland), Slovenska Bistrica (Slovenia) and Voru (Estonia) have signed contracts with the successful bidders of their public tender for the modernisation of their street/road lighting systems. Deliverable 13 The expected reduction of CO2 in the 3 cities which provided specific data for the renovation of the street lighting system spreads from 43,3 % for Slovenska Bistrica up to 51,6 % for Voru, as estimated by the independant environmental consultancy EPTA. Standard documents for controlling the emission reductions have been developped. The EPTA report, the developed matrixes for data collection and the calculations of the C02 reduction are dowloadable hereinafter.
Deliverable 14 Deliverable 15 BUtK website, the website you are currently visiting. Deliverable 16
Deliverable 17 Six national workshops in 2008 and 2009 Romania
Estonia
Latvia
Slovenia
Poland
Deliverable 18 BUtK had a stand at POLEKO 2008 (International Trade Fair for Environmental Protection) that took place on 27-30 October 2008 in Poznan, Poland. For more information and see pictures of this event please click on the link.
Deliverable 19 BUtK held a stand at the Green Week 2009. (23-26 June 2009) Deliverable 20 BUtK final workshop - COST CUTTING WITH SMART LIGHING - 2nd December 2009 - The Centre, Brussels |
|
|
|
|